The new electronic independence re-creates the world in the image of a global village - Marshall McLuhan

CAM Designer


Inspection:

In this Inspection, the customer input files will be checked whether it satisfies the Customer Manufacturing Capability and its End Customers Specifications. The checks performed in this Inspection phase are:

Drill checks (Drill-Drill spacing & Double hits)
Dimension checking
Annular ring Checks
Min Air gap/Min trace width checks
Drill to copper spacing
Mask layer checks (Mask clearance & Coverage)
Silk layer checks (Min Silk legend)
Any other customer specific checks

Editing:

The violations found during Inspection phase are fixed in this Editing phase based on Customer specifications. Also customer Specific standard operations will be carried out.

The Edit operations are:

Board outline correction for FAB dimension
Double hits elimination
Annular ring corrections
Air gap & Trace width corrections
Drill to copper spacing corrections
Etch compensation on signal layers
Mask clearance correction
Coverage corrections
Silk legend width correction
Silk layer clipping

Penalization:

The single boards/Arrays (Arrays will be customer specific) will be repeated in Panel using Customer Specifications. As per Customer Specifications the panel entities will be added.

The Panel entities are:

Coupons
Registration holes
Tooling holes
Copper thieving
Copper balancing
Panel Text
Other Customer Specific Entities

No comments:

Post a Comment

Popular Posts